Contact – Cell Site Automation, Remote Equipment Monitoring, Generators, Access Control, Site Security
From Asentria Portal

The PowerTek intelligent AC power strips are designed to measure the input and individual outlet current consumption and at the same time, provide the ability to managing power for equipment connected to it. User can control the power on/off for any device connected to the PDU remotely.

This article describes the use and configuration of the EventSensor Reporting feature which allows one SiteBoss to report EventSensor data to a host SiteBoss.

This is the User Manual, Installation and Operation Guidelines for the PowerBoss 4.

This document contains a User Manual with Installation and Operation Guidelines for the PowerBoss 6 and PowerBoss 7.

This document provides the necessary information on installing the PB-R30 Relay Switch.

This User Manual describes the Installation and Operation Guidelines for the PowerBoss High Current DC Power Switch.